Description

Watson Civil Construction is looking for subcontractors to join our team on the Reedy Creek Improvement District, World Drive North Phase III Project.

The scope of work includes, but is not limited to the following:

The scope of work for the World Drive North Phase III project includes replacing the existing two-way Floridian Way roadway with the extension of the four-lane divided World Drive from approximately 3800 LF south (Station 162+66.29) of Seven Seas Drive to approximately 700 LF North (Station 75+11.79) of Maple Road. New construction includes notable travel-way items such as three (3) roundabouts and a single span (84’­0” overall bridge length) Florida I-36 beam superstructure bridge. Associated work items include, but are not limited to: regular excavation, subsoil excavation, embankment, lime rock, and asphalt base, concrete curb elements, an extension the of existing culvert(s), new box culvert(s), underground storm drainage, potable water main, reclaimed water main, sanitary sewer (gravity), sanitary force main, chilled water (base bid and alternate), communications (Smart City, ITS) infrastructure, electrical infrastructure, clearing, and replacement of existing gas main infrastructure.

The Plans, Specifications and all related documents can be requested by contacting [email protected].

All bids are due by November 8th at 5:00PM

All quotes need to be sent to [email protected]